CANPAVE / PRACTICAL PLANNINGPut the guidance to work
Phase construction around operating entrances and accessible routes. Include marking layout, temporary parking, notices and reopening criteria in the scope instead of leaving them to the final day.
Build a site-specific scope
A site assessment should connect visible symptoms with drainage, loading and the underlying structure. Confirm quantities, materials, work windows and acceptance requirements before comparing proposals. General guidance cannot replace project-specific investigation or required engineering.
