Planning a parking lot resurfacing project

Start with a condition survey, levels and an access plan. Identify damaged base areas before defining milling and overlay limits. Confirm how the work meets curbs, catch basins, entrances and adjacent pavement.

Open paved parking area with tall light poles.CANPAVE / PRACTICAL PLANNING

Put the guidance to work

Phase construction around operating entrances and accessible routes. Include marking layout, temporary parking, notices and reopening criteria in the scope instead of leaving them to the final day.

Build a site-specific scope

A site assessment should connect visible symptoms with drainage, loading and the underlying structure. Confirm quantities, materials, work windows and acceptance requirements before comparing proposals. General guidance cannot replace project-specific investigation or required engineering.