ONE CONTACT. LOCAL PAVING EXPERTISE.(833) 696-9996
CanPave — maple leaf and roadway logoGET A QUOTE
MENU
CANPAVE / CANADA’S PAVING NETWORK

Build a practical pavement capital plan

Separate urgent corrective work, preventive maintenance and capital renewal. Rank each property by condition, operational consequence and timing constraints. A consistent rating method makes portfolio comparisons more useful.

Aerial view of a large commercial building, access roads and parking areas.CANPAVE / PRACTICAL PLANNING

Put the guidance to work

Maintain an inventory of area, surface type, condition, last treatment and recommended action. Refresh budgets after assessments and tender feedback. Record assumptions so next year’s plan can be compared fairly.

Build a site-specific scope

A site assessment should connect visible symptoms with drainage, loading and the underlying structure. Confirm quantities, materials, work windows and acceptance requirements before comparing proposals. General guidance cannot replace project-specific investigation or required engineering.

LET’S TALK PAVEMENT

Your next project starts here.

GET A QUOTE